HP Mittal Energy refinery-linked tankage during project execution

Project Reference · Tanks & Terminals

HP Mittal Energy: Refinery-Linked Tankage

18-Tank Refinery Support Scope

EPC delivery of 80,000 m³ of refinery-linked tankage supporting operations at HMEL’s Bhatinda complex.

LocationBhatinda, India
ClientHP Mittal Energy Limited (HMEL)
DeliveryEPC
StatusCompleted
80,000 m³Refinery-support scopeBhatinda complex

Project Overview

Chemie-Tech delivered storage terminal facilities for HP Mittal Energy Limited at Bhatinda under an EPC model. The project sits in the refinery-support category, where storage infrastructure has to align with plant operations, utility interfaces and the broader performance requirements of an operating industrial complex.

Project Context

Storage work tied to a refinery rarely stands alone. Readiness has to match upstream and downstream systems, which means schedule slippage or interface misses quickly become plant-wide issues.

Chemie-Tech Role

Chemie-Tech aligned the package to refinery milestones, coordinating engineering, procurement, erection and testing around the wider operational sequence rather than treating the tankage scope in isolation.

Delivery Status

The refinery-linked storage EPC scope is recorded as completed.

Verified Scope

  • Engineering, procurement and construction
  • Storage terminal facilities
  • Tankage and associated infrastructure
  • Utility, piping and E&I interfaces
  • Testing and handover support

Discuss Your Project

Planning similar storage, terminal, or process scope?

Discuss Project Scope View all references